Industries must obtain Consent to Establish before building and Consent to Operate before starting production from the State Pollution Control Board, based on their pollution category.
Categories
- Red: highly polluting — strict conditions, shorter validity
- Orange: moderately polluting
- Green: low polluting
- White: practically non-polluting — usually only intimation, no consent needed
Documents
Site plan, process flow, raw materials, effluent/emission details, pollution control equipment, land documents.
Validity
CTO validity varies by category (longer for green). Renew before expiry.
Frequently asked questions
Do service offices need consent?
Usually no — most are white category or outside the scope.
Can I start building without CTE?
No, CTE is required before setting up.
Is it online?
Most SPCBs accept online applications.
This article is general information as of November 2026, not legal or tax advice. Laws, rates and due dates change — confirm on the official portal or talk to a NewStarts expert before acting.
Pollution Control Board consents before and after you start production.